|
|
|
|
|
|
|
|
|
|
Tak FSQ-106 |
|
Equipment in the Park
position after a night of work |
Close-up of equipment at rest, you can even see the
water cooling lines |
|
|
|
|
|
Full Set-up as it sits. Water cooling system with
Modified chiller on floor |
Scope looking up |
Full set-up as it sits |
|
|
|
|
|
|
|
|
|
Image train up close. Sbig 10xe>Crisp
Adaptor>CFW-2>DF-2>Felstein Adaptor |
|
|
|
|
|
|
|
I |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This site was last updated
08/04/06
|